March 4 meeting to discuss upgrades for west Quartzsite interchange
QUARTZSITE – The Town of Quartzsite and the Arizona Department of Transportation will hold a public meeting Wednesday, March 4, to share plans for a project at Interstate 10 that will widen Quartzsite Boulevard and improve frontage roads.
The public meeting is scheduled to begin with an open house at 5:30 p.m. and a presentation at 6 p.m. Project planners will then be available for questions and comments. The meeting will be held at the Quartzsite Improvement Association, 235 Ironwood St. For those who cannot attend the meeting, a presentation and meeting exhibits will be available afterward on the project website, azdot.gov/WestQuartzsiteTI.
The project includes:
- Widening Quartzsite Boulevard between Main Street and Dome Rock Road/Kuehn Street from two to four travel lanes, plus dedicated right and left turn lanes at intersections
- Replacing the two-lane Quartzsite Boulevard bridge over I-10 with a seven-lane structure that includes sidewalks
- Widening and reconstructing the interchange ramps and intersections
- Widening and reconstructing the Dome Rock Road and Kuehn Street intersection and approaches
- Providing wider outside lanes on Quartzsite Boulevard to accommodate bicyclists
- Constructing sidewalks and sidewalk ramps
- Installing new street lighting
- Enhancing business access
- Evaluating traffic signals at ramp intersections, Main Street, Dome Rock Road and Kuehn Street
ADOT is also welcoming public comment through April 3 through the public meeting and:
For more information, please visit the project website, azdot.gov/WestQuartzsiteTI.
Legal Disclaimer:
EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.